Course Objective
Introducing the students of civil engineering into the field of international construction contracts law which is useful to be mastered by project and contract managers of international construction and consulting companies.
Course Content
Legal and contractual terminology in construction contracts, EPC and PC contracts, structure and breakdown of standard construction contracts, contractual documents, standard provisions as to the time of contract, cost of contract and advanced payment, provisions regarding the quality and acceptance of construction work completed.
Prerequisites
None
Delivery and Teaching Methods
- Face to face
Learning Outcomes and Contribution to Programme Outcomes
- 1- To develop the ability - to review, prepare, fill out, complete and revise the most well-known standard American, English and European construction contracts JSC, AIA and FIDIC. - to discern the structure and the most important contractual provisions of construction contracts quickly by comparing them to standard contracts. - analyze various alternative contract provisions and to evaluate the impact of each alternative on expected project outcomes. - to understand the legal relationship between the parties to the construction contract; the employer, the engineer and the contractor. - to interpret the obligations of the parties and how to compare them with standard terms.
- 2- Understanding methods to manage construction contracts.
- 3- Make amendments and appendices to contracts.
- 4- Formulate change orders.
- 5- Prepare loss-expense and time extension claims.
- 6- Prepare applications to terminate construction contracts.
- 7- Identify the breeches of contracts and consequential damages.
- 8- Evaluate and calculate the magnitude of damages.
- 9- Calculate time extensions.
- 10- What is acceptable construction quality with or without construction defects in relation to different standard contracts; English Sales of Good Act; Turkish law of obligations.
Contribution level ranges from 0 (none) to 5 (highest).
| PO | Programme outcome | Contribution level |
|---|---|---|
| PO1 | Obtain ability to carry out advanced research activities, both individual and as a member of a team | 0 |
| PO2 | Obtain ability to evaluate research topics and comment with scientific reasoning | 0 |
| PO3 | Obtain ability to initiate and create new methodologies, implement them on novel research areas and topics | 0 |
| PO4 | Obtain ability to produce experimental and/or analytical data in systematic manner, discuss and evaluate data to lead scintific conclusions | 0 |
| PO5 | Obtain ability to apply scientific philosophy on analysis, modelling and design of engineering systems | 0 |
| PO6 | Obtain ability to synthesis available knowledge on his/her domain to initiate, to carry, complete and present novel research at international level | 0 |
| PO7 | Contribute scientific and technological advancements on engineering domain of his/her interest area | 0 |
| PO8 | Contribute industrial and scientific advancements to improve the society through research activities | 0 |
Weekly Topics
| Week | Topic |
|---|---|
| 1 | Modern Construction Contract |
| 2 | Standard Construction Contracts JCT, AIA, FIDIC |
| 3 | Overview of JCT structure compared to others |
| 4 | Famous Law Cases 1: Quality issues, defects, acceptance of works |
| 5 | Famous Law Cases 2:: Unforeseen ground conditions |
| 6 | Famous Law Cases 3: Delayed or inadequate payments |
| 7 | Famous Law Cases 4: Design issues (fit for purpose or reasonable skill) |
| 8 | Change orders |
| 9 | Breeches of contract. Fundamental terms. Hadley- Baxendale principle |
| 10 | Damages |
| 11 | Relevant conditions |
| 12 | Time extensions. Liquidated damages as opposed to penalties. |
| 13 | Claims for loss and expense |
| 14 | Force Majeure terms; Contract termination |
| 15 | Final Exam Period |
| 16 | Final Exam Period |
Assessment
| Method | Number | Weight |
|---|---|---|
| Midtermexam | 1 | %25 |
| Quiz | 2 | %15 |
| Homework | 5 | %25 |
| Finalexam | 1 | %35 |
| Total | %100 | |
ECTS Workload
| Activity | Number | Duration (hours) | Total |
|---|---|---|---|
| Lecture Hours (Including exam week: 16 x lecture hours) | 16 | 3 | 48 |
| Out-of-Class Study Time | 14 | 2 | 28 |
| Assignments | 4 | 4 | 16 |
| Midterm Exam Preparation | 1 | 10 | 10 |
| Quizzes/Studio Critique | 2 | 4 | 8 |
| Final Exam Preparation | 1 | 15 | 15 |
| Total workload (hours) | 125 | ||
| ECTS equivalent (workload / 30) | 4.2 | ||
Resources
- Other Richard Stones, “ Modern Law of Contract”, 2003, Cavendish Press, UK
- Other Knowles, R., “150 contractual problems and their solutions”, 2005, Blackwell Publishing Ltd, Oxford
- Other Powell-Smith, V, J. Redmond and D. Stephenson, “ Civil Engineering Claims”, 1999, 3 rded, Blackwell Science Ltd, Oxford
- Other I.N. Duncan, Hudson’s Building and Engineering Contracts, 1995, 11ed, Sweet & Maxwell, London.
- Other JCT SBC/Q TCD, “StandardBuilding Contract With Quantities” , 2011, Sweet&Maxwell , UK
- Other AIA , American Institute of Architects, “General conditions of the contract for construction” 2007, New York
- Other FIDIC , “ Conditions of contract for construction”, 1999
Instructors
- Asst. Prof. Dr. Saman AMINBAKHSH (Lecturer)