Archived curriculum
This course information is shown from a curriculum applied in previous years. It is kept available for equivalence and graduation procedures.
- Unit
- Civil Engineering
- Current program
- Civil Engineering
- Semester
- Elective Courses
- Type
- Elective
- Credit
- 3
- ECTS
- 6
- Language
- İngilizce
- Contact hours
- Lecture 3 · Practice 0 · Lab 0
On this page
Course Objective
This course aims to introduce the students the basic design criteria of the wastewater and stormwater collection systems of the municipality areas. Students will also gain experience in the project design of these systems through their term project.
Course Content
Design of wastewater and stormwater collection systems, hydraulic design of pumping station and pumping line, bill of quantities.
Prerequisites
CE 110 Engineering Graphics and Design
CE 310 Hydraulic Engineering
Delivery and Teaching Methods
- Face to face
- Lecture
- Question and answer
- Practice
- Problem solving
Learning Outcomes and Contribution to Programme Outcomes
- 1The students will learn population analysis and estimation for a municipality area.
- 2The students will learn the general layout of wastewater and stormwater collection systems.
- 3The students will design the sewers of a selected municipality area.
- 4The students will apply hydraulic design of pumping station and pumping line.
- 5The students will learn to prepare the bill of quantities.
Weekly Topics
| Week | Topic |
|---|---|
| 1 | 1. INTRODUCTION 1.1. Scope of the course |
| 2 | 2. DESIGN OF WASTEWATER COLLECTION SYSTEMS 2.1. General considerations 2.2. Population analysis; estimation of the projected population of the municipality |
| 3 | 2.3. Determination of the total wastewater to be collected with the system |
| 4 | 2.4. Design of general layout of the wastewater collection system |
| 5 | 2.4. Design of general layout of the wastewater collection system |
| 6 | 2.5. Design of the sanitary sewers for the selected area (calculation of pipe discharges, diameters, elevations, etc.) |
| 7 | 2.5. Design of the sanitary sewers for the selected area (calculation of pipe discharges, diameters, elevations, etc.) |
| 8 | 2.6. Hydraulic design of pumping station & pumping line |
| 9 | 2.7. Bill of quantities |
| 10 | 3. DESIGN OF STORMWATER COLLECTION SYSTEMS 3.1. General considerations 3.2 Design of general layout of the stormwater collection systems |
| 11 | 3.2. Design of general layout of the stormwater collection systems |
| 12 | 3.3. Design of the sewers for the selected area (determination of the catchment areas, calculation of pipe discharges, diameters, elevations, etc.) |
| 13 | 3.3. Design of the sewers for the selected area (determination of the catchment areas, calculation of pipe discharges, diameters, elevations, etc.) |
| 14 | 3.4. Bill of quantities |
| 15 | Final Exam Period |
| 16 | Final Exam Period |
Assessment
| Method | Number | Weight |
|---|---|---|
| Midtermexam | 1 | %30 |
| Project | 1 | %30 |
| Finalexam | 1 | %40 |
| Total | %100 | |
ECTS Workload
| Activity | Number | Duration (hours) | Total |
|---|---|---|---|
| Lecture Hours (Including exam week: 16 x lecture hours) | 16 | 3 | 48 |
| Midterm Exam Preparation | 1 | 15 | 15 |
| Projects | 1 | 20 | 20 |
| Final Exam Preparation | 1 | 25 | 25 |
| Out-of-Class Study Time | 14 | 3 | 42 |
| Total workload (hours) | 150 | ||
| ECTS equivalent (workload / 30) | 5 | ||
Resources
- Other Wastewater Collection System Maintenance, Michael J. Parcher, CRC Press, Taylor & Francis Group, 1997.
- Other Hydraulic structures, P. Novak, A.I.B. Moffat, C. Nalluri, R. Nara-yanan. Taylor & Francis. 2 Park Square, Milton Park, Abingdon, Oxon OX14 4RN. 2007.
- Other Hydraulic Engineering, J. A. Roberson, J. J. Cassidy, M. N. Chaudhry, John Wiley & Sons, New York, 1998.
Instructors
- Assoc. Prof. Dr. Yakup DARAMA (Lecturer)