Skip to content
Atılım University, 30th year

CE463

International Construction Contracts

Archived curriculum

This course information is shown from a curriculum applied in previous years. It is kept available for equivalence and graduation procedures.

Unit
Civil Engineering
Current program
Civil Engineering
Semester
Elective Courses
Type
Elective
Credit
3
ECTS
6
Language
İngilizce
Contact hours
Lecture 3 · Practice 0 · Lab 0
Back to programme
On this page
  1. Course Objective
  2. Course Content
  3. Prerequisites
  4. Methods
  5. Learning outcomes
  6. Weekly Topics
  7. Assessment
  8. ECTS Workload
  9. Resources
  10. Instructors

Course Objective

Introducing the students of civil engineering into the field of international construction contracts law which is useful to be mastered by project and contract managers of international construction and consulting companies.

Course Content

Legal and contractual terminology in construction contracts, EPC and PC contracts, structure and breakdown of standard construction contracts, contractual documents, standard provisions as to the time of contract, cost of contract and advanced payment, provisions regarding the quality and acceptance of construction work completed.

Prerequisites

None

Delivery and Teaching Methods

  • Face to face
  • Lecture
  • Question and answer

Learning Outcomes and Contribution to Programme Outcomes

  1. 1 To develop the ability - to review, prepare, fill out, complete and revise the most well-known standard American, English and European construction contracts JSC, AIA and FIDIC. - to discern the structure and the most important contractual provisions of construction contracts quickly by comparing them to standard contracts. - analyze various alternative contract provisions and to evaluate the impact of each alternative on expected project outcomes. - to understand the legal relationship between the parties to the construction contract; the employer, the engineer and the contractor. - to interpret the obligations of the parties and how to compare them with standard terms.
  2. 2Understanding methods to manage construction contracts.
  3. 3Make amendments and appendices to contracts.
  4. 4Formulate change orders.
  5. 5Prepare loss-expense and time extension claims.
  6. 6Prepare applications to terminate construction contracts.
  7. 7Identify the breeches of contracts and consequential damages.
  8. 8Evaluate and calculate the magnitude of damages.
  9. 9Calculate time extensions.
  10. 10What is acceptable construction quality with or without construction defects in relation to different standard contracts; English Sales of Good Act; Turkish law of obligations.

Weekly Topics

WeekTopic
1Modern Construction Contract
2Standard Construction Contracts JCT, AIA, FIDIC
3Overview of JCT structure compared to others
4Famous Law Cases 1: Quality issues, defects, acceptance of works
5Famous Law Cases 2:: Unforeseen ground conditions
6Famous Law Cases 3: Delayed or inadequate payments
7Famous Law Cases 4: Design issues (fit for purpose or reasonable skill)
8Change orders
9Breeches of contract. Fundamental terms. Hadley- Baxendale principle
10Damages
11Relevant conditions
12Time extensions. Liquidated damages as opposed to penalties.
13Claims for loss and expense
14Force Majeure terms; Contract termination
15Final Exam Period
16Final Exam Period

Assessment

MethodNumberWeight
Midtermexam1%25
Quiz2%15
Homework5%25
Finalexam1%35
Total%100

ECTS Workload

ActivityNumberDuration (hours)Total
Lecture Hours (Including exam week: 16 x lecture hours)16348
Midterm Exam Preparation11010
Quizzes/Studio Critique2510
Assignments5525
Final Exam Preparation11515
Out-of-Class Study Time14342
Total workload (hours)150
ECTS equivalent (workload / 30)5

Resources

  • Other Richard Stones, “ Modern Law of Contract”, 2003, Cavendish Press, UK
  • Other Knowles, R., “150 contractual problems and their solutions”, 2005, Blackwell Publishing Ltd, Oxford
  • Other Powell-Smith, V, J. Redmond and D. Stephenson, “ Civil Engineering Claims”, 1999, 3 rded, Blackwell Science Ltd, Oxford
  • Other I.N. Duncan, Hudson’s Building and Engineering Contracts, 1995, 11ed, Sweet & Maxwell, London.
  • Other JCT SBC/Q TCD, “StandardBuilding Contract With Quantities” , 2011, Sweet&Maxwell , UK
  • Other AIA , American Institute of Architects, “General conditions of the contract for construction” 2007, New York
  • Other FIDIC , “ Conditions of contract for construction”, 1999

Instructors

  • Asst. Prof. Dr. Saman AMINBAKHSH (Lecturer)