CE464

Construction Scheduling and Cost Control

Archived curriculum

This course information is shown from a curriculum applied in previous years. It is kept available for equivalence and graduation procedures.

Unit
Civil Engineering
Current program
Civil Engineering
Semester
Elective Courses
Type
Elective
Credit
3
ECTS
6
Language
İngilizce
Contact hours
Lecture 3 · Practice 0 · Lab 0
Back to programme
On this page
  1. Course Objective
  2. Course Content
  3. Prerequisites
  4. Methods
  5. Learning outcomes
  6. Weekly Topics
  7. Assessment
  8. ECTS Workload
  9. Resources
  10. Instructors

Course Objective

Scheduling and cost control are essential tools for successful construction management. Scheduling deals with network based schedules of construction activities (like critical path method) and cost control provides comparison of actual and planned financial information in the course of the project. Time extension claims in construction contracts wherein the proof of cause-effect relationship is the essence of the whole argument are currently required to be submitted together with construction schedules like critical path method.To furnish the civil engineering students with this skill set a popular computer software for construction scheduling and cost control shall be taught thoroughly in this course.

Course Content

Introduction and some advanced studies in a computer application like MS Project, extensively used for construction scheduling and cost control; time extension clauses in international construction contracts; cause-effect relationship to prove construction claims.

Prerequisites

CE399

Delivery and Teaching Methods

  • Face to face
  • Lecture
  • Question and answer
  • Problem solving

Learning Outcomes and Contribution to Programme Outcomes

  1. 1• To develop the ability to schedule construction projects like any other industrial, commercial or office works.
  2. 2• Present achieved progress in a variety of formats ranging from a simple bar chart to more complicated network type diagrams.
  3. 3• Present cost data in graphic form or as summarized in tables.
  4. 4• Check and verify time-wise and financial success of the project during performance.
  5. 5• Manage costs, work and resources used in the project.
  6. 6• Types of delays and acceptable reasons for time extensions in international construction contracts.
  7. 7• How to implement construction schedules to prove loss-expense and time extension claims.

Weekly Topics

WeekTopic
1What is scheduling and cost control in construction management .
2Types of scheduling techniques
3Types of scheduling techniques
4Precedence relationships and critical path method
5Precedence relationships and critical path method
6Preparing the list of construction activities ( teaching the computer application)
7Specifying construction resources
8Assigning resources to activities
9Formatting and sharing the plan
10Tracking progress on activities
11Advanced windows showing activity details
12Advanced windows to assign resources to activities
13Time extensions in construction conditions. Liquidated damages as opposed to penalties.
14Time extensions in construction conditions. Liquidated damages as opposed to penalties.
15Final Exam Period
16Final Exam Period

Assessment

MethodNumberWeight
Finalexam1%30
Midtermexam2%50
Lab6%20
Total%100

ECTS Workload

ActivityNumberDuration (hours)Total
Lecture Hours (Including exam week: 16 x lecture hours)16348
Midterm Exam Preparation21224
Final Exam Preparation11818
Out-of-Class Study Time14342
Laboratory6318
Total workload (hours)150
ECTS equivalent (workload / 30)5

Resources

  • Textbook Microsoft Project 2010, Step by Step, Carl Chatfield and T. Johnson, Microsoft Press, Washington
  • Other Powell-Smith, V, J. Redmond and D. Stephenson, “ Civil Engineering Claims”, 1999, 3 rded, Blackwell Science Ltd, Oxford

Instructors

  • Asst. Prof. Dr. Saman Aminbakhsh (Lecturer)