Course Objective

Scheduling and cost control are essential tools for successful construction management. Scheduling deals with network based schedules of construction activities (like critical path method) and cost control provides comparison of actual and planned financial information in the course of the project. Time extension claims in construction contracts wherein the proof of cause-effect relationship is the essence of the whole argument are currently required to be submitted together with construction schedules like critical path method.To furnish the civil engineering students with this skill set a popular computer software for construction scheduling and cost control shall be taught thoroughly in this course.

Course Content

Introduction and some advanced studies in a computer application like MS Project, extensively used for construction scheduling and cost control, time extension clauses in international construction contracts, cause-effect relationship to prove construction claims.

Prerequisites

None

Delivery and Teaching Methods

  • Face to face
  • Lecture
  • Demonstration
  • Question and answer
  • Problem solving

Learning Outcomes and Contribution to Programme Outcomes

  1. 1To develop the ability to schedule construction projects like any other industrial, commercial or office works.
  2. 2Present achieved progress in a variety of formats ranging from a simple bar chart to more complicated network type diagrams.
  3. 3Present cost data in graphic form or as summarized in tables.
  4. 4Check and verify time-wise and financial success of the project during performance.
  5. 5Manage costs, work and resources used in the project.
  6. 6Types of delays and acceptable reasons for time extensions in international construction contracts.
  7. 7How to implement construction schedules to prove loss-expense and time extension claims.

Contribution level ranges from 0 (none) to 5 (highest).

PO Programme outcome Contribution level
PO1 Gains the ability to apply the acquired knowledge in mathematics, science and engineering. 0
PO2 Gains the ability to identify, formulate and solve complex engineering problems 3
PO3 Gains the ability to accomplish the integration of systems. 0
PO4 Gains the ability to design, develop, implement and improve complex systems, components, or processes. 2
PO5 Acquires the ability to select,develop and use suitable modern engineering techniques and tools. 2
PO6 Gains the ability to design/conduct experiments and collect, analyze, and interpret data. 3
PO7 Gains the ability to function independently and in teams. 1
PO8 Gains the ability to make use of oral and written communication skills effectively. 2
PO9 Gains the ability to recognize the need for and engage in life-long learning. 0
PO10 Attains the ability to understand and exercise professional and ethical responsibility. 3
PO11 Gains the ability to understand the impact of engineering solutions. 0
PO12 Cultivates the ability to have knowledge of contemporary issues. 2

Weekly Topics

WeekTopic
1What is scheduling and cost control in construction management .
2Types of scheduling techniques
3Types of scheduling techniques
4Precedence relationships and critical path method
5Precedence relationships and critical path method
6Preparing the list of construction activities ( teaching the computer application)
7Specifying construction resources
8Assigning resources to activities
9Formatting and sharing the plan
10Tracking progress on activities
11Advanced windows showing activity details
12Advanced windows to assign resources to activities
13Time extensions in construction conditions. Liquidated damages as opposed to penalties.
14How to implement construction schedules to prove loss and expense claims
15Final Exam Period
16Final Exam Period

Assessment

MethodNumberWeight
Midtermexam3%25
Lab6%25
Finalexam1%50
Total%100

ECTS Workload

ActivityNumberDuration (hours)Total
Lecture Hours (Including exam week: 16 x lecture hours)16348
Out-of-Class Study Time14228
Midterm Exam Preparation3721
Final Exam Preparation12222
Laboratory236
Total workload (hours)125
ECTS equivalent (workload / 30)4.2

Resources

  • Textbook Microsoft Project 2010, Step by Step, Carl Chatfield and T. Johnson, Microsoft Press, Washington
  • Other Powell-Smith, V, J. Redmond and D. Stephenson, “ Civil Engineering Claims”, 1999, 3 rded, Blackwell Science Ltd, Oxford